Green motion PIPISTREL SKYCHARGE Teknik Dokümantasyon Kılavuzu - Sayfa 9
Akü Şarj Cihazı Green motion PIPISTREL SKYCHARGE için çevrimiçi göz atın veya pdf Teknik Dokümantasyon Kılavuzu indirin. Green motion PIPISTREL SKYCHARGE 17 sayfaları.
Ayrıca Green motion PIPISTREL SKYCHARGE için: Teknik Dokümantasyon Kılavuzu (15 sayfalar)
SKYCHARGE – TECHNICAL DOCUMENTATION
3.2 Changing the charging current
Electric shock hazard! Please make sure that the main power supply is turned off before trying to
connect the power to the charging station. In any case, working under voltage shall be avoided.
The electrical cable must reach the terminal from the left.
The electrical cable and the communication cable can be introduced into the SKYCHARGE housing from the
bottom left side (1 & 2) or from the rear left side (3).
The electrical connection is made on the power supply terminals located at the bottom of the charger. (See in
blue circle)
Please measure the rotating field and the line voltage.
Page 9