Garage Tek GT4011EE Installationsanleitung Handbuch - Seite 4
Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Kettenzüge Garage Tek GT4011EE herunter. Garage Tek GT4011EE 8 Seiten. Two point hoist
TWO POINT HOIST - ASSEMBLY INSTRUCTIONS
STEP 5
STEP 5
SYSTEM SETUP
STEP #5: PLACE THE OBJECT TO BE HOISTED UNDER THE RING HOOKS AND TIE THE DROP CORDS TO THE
STRAPS. TRY TO TIE THE STRAPS ONTO THE DROP CORDS AT THE SAME HEIGHT.
STEP #6: FASTEN THE STRAPS TO THE OBJECT TO BE LIFTED AND ADJUST THE STRAP LENGTHS AS
NEEDED SO THE LOAD IS LEVEL.
STEP #7: SLOWLY PULL THE RAISING CORD TO CHECK THE LOAD IS LEVEL. (BOTH DROP ROPES MUST
HAVE EQUAL TENSION SO THE LOAD REMAINS LEVEL WHEN LOWERING OR RAISING.) THE METHOD USED
TO RAISE OR LOWER AND OBJECT IS SHOWN / EXPLAINED ON PAGE 2.
STEP 6
STEP 7
A FINAL SAFETY NOTE: NEVER RAISE OR LOWER AN ITEM WITH A PERSON UNDER
THE OBJECT.
PG 4
QUESTIONS ???? CALL 1-866 664 2724
REV 1, 01/1