Kohler ARICA K-705230 Installationsanleitung Handbuch - Seite 10
Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Armaturen für das Badezimmer Kohler ARICA K-705230 herunter. Kohler ARICA K-705230 12 Seiten. Neo-angle shower enclosures
Q. INSTALL DRIP RAIL AND INSERT
The drip rail base should be on the bottom of the glass
panel with the flat side towards the inside (wet side) of the
shower. If the drip rail is currently located at the top of the
glass panel, slide off both pieces and push onto the
bottom of the glass panel.
Slide the drip rail insert into the longer drip rail base,
through the length of base and into the smaller drip rail
base. Position insert cut-out around the edge of the
decorative pivot cover installed on the door panel.
Align each end of the drip rail insert with the ends of the
drip rail base and trim excess from each end. Trim the
short end of the insert back 1/2" (1.3cm) from the edge of
the glass to prevent interference with the door seal.
R. SEALING
Thoroughly clean all dust, dirt and grease from the bottom
frame and shower ledge surfaces to be sealed. Make sure
surfaces are dry.
CAUTION: Risk of product damage. Apply
silicone sealant around the outside of the enclosure
only . Sealant applied to the inside of the enclosure
will cause leakage and damage.
Carefully apply a bead of silicone sealant around the
outside (dry side) of door where:
1) Bottom frame meets the shower ledge.
2) Wall jambs meet the shower walls.
BC
116896-2-
Drip Rail Base
10
Trim
Drip Rail
Insert
Kohler Co., Kohler, WI U.S.A.