Kohler ESCALE K-24837T-S Installationsanleitung Handbuch - Seite 16

Blättern Sie online oder laden Sie pdf Installationsanleitung Handbuch für Toiletten Kohler ESCALE K-24837T-S herunter. Kohler ESCALE K-24837T-S 24 Seiten. Vitreous china wall-hung p-trap toilet
Auch für Kohler ESCALE K-24837T-S: Installationsanleitung Handbuch (24 seiten), Installationsanleitung Handbuch (45 seiten)

Kohler ESCALE K-24837T-S Installationsanleitung Handbuch
E. Faceplate Installation
E.
1. Push slot A and slot B of the break water board forward
and then insert into the detent.
Tip 1:
When installing the break water board, please make
sure the slot is align with the detent.
Tip 2:
After the break water board is installed, please make
sure hinge ears are on the bottom.
1.
1
2
2. When tighten four locknuts on supporting board, adjust to
"OPEN" mark as shown.
2.
3. Tighten four screws to "LOCK" mark after nstalling
supporting board as shown.
3.
4. Tighten the long screws to the bolt through the hole.
Note:
the long screw should be vertical to the wall.
4.
1263048-T01-D
A B
OPEN
LOCK
Detent
Supporting Board
Screw
Bracket
-11-
Mask
Slot B
B
Break Water Board
Slot A
A
Hinge Ear
Locknut
Fixing Lock
Supporting Board
Locknut
Long Screw