Kohler ESCALE K-24837T-S 설치 지침 매뉴얼 - 페이지 16
{카테고리_이름} Kohler ESCALE K-24837T-S에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Kohler ESCALE K-24837T-S 24 페이지. Vitreous china wall-hung p-trap toilet
Kohler ESCALE K-24837T-S에 대해서도 마찬가지입니다: 설치 지침 매뉴얼 (24 페이지), 설치 지침 매뉴얼 (45 페이지)
E. Faceplate Installation
E.
1. Push slot A and slot B of the break water board forward
and then insert into the detent.
Tip 1:
When installing the break water board, please make
sure the slot is align with the detent.
Tip 2:
After the break water board is installed, please make
sure hinge ears are on the bottom.
1.
1
2
2. When tighten four locknuts on supporting board, adjust to
"OPEN" mark as shown.
2.
3. Tighten four screws to "LOCK" mark after nstalling
supporting board as shown.
3.
4. Tighten the long screws to the bolt through the hole.
Note:
the long screw should be vertical to the wall.
4.
1263048-T01-D
A B
OPEN
LOCK
Detent
Supporting Board
Screw
Bracket
-11-
Mask
Slot B
B
Break Water Board
Slot A
A
Hinge Ear
Locknut
Fixing Lock
Supporting Board
Locknut
Long Screw