Aqua Creek Products F-SCTXL-T Handbuch - Seite 4
Blättern Sie online oder laden Sie pdf Handbuch für Hebesysteme Aqua Creek Products F-SCTXL-T herunter. Aqua Creek Products F-SCTXL-T 15 Seiten.
1
LIFT THE SCOUT EXCEL MAST ASSEMBLY FROM THE SHIPPING CONTAINER.
INSERT THE 1.90" [48mm] POST OF THE MAST ASSEMBLY INTO THE DECK
ANCHOR. EASE THE MAST ASSEMBLY DOWN UNTIL IT RESTS ON THE DECK
SURFACE. ROTATE THE BASE UNTIL THE FIXING ANCHOR HOLE LINES UP
WITH THE FIXING ANCHOR. INSTALL THE 1/2"-13X1 1/2" HEX BOLT AND
WASHER (PROVIDED IN THE STOCK BOX) TO HOLD DOWN THE LIFT. TIGHTEN
THE BOLT.
FIXING ANCHOR HOLE
POST
FIG. 01
2
REMOVE THE SHIPPING STRAP
AND ALL PACKING FROM THE
ACTUATOR. CONNECT THE LIFTING
ARM BETWEEN THE MAST AND THE
ACTUATOR. TIGHTEN NYLOCK NUTS.
PRODUCT ASSEMBLY
NOTE: THE LIFTING AND CONTROL
ARM ARE EASILY FLIPPED AROUND
THE WRONG WAY. MAKE SURE
THAT "A" MATCHES UP TO "A" AND
"B" GOES TO "B"
FIG. 02
NOTE: BE CAREFUL NOT TO OVER-
TIGHTEN BOLTS. OVER-TIGHTENING
CAN CAUSE DAMAGE AND COMPROMISE
THE SAFETY OF YOUR LIFT.
Aqua Creek Products
DETAIL A
SCALE 1 : 1
6/27/2022 8:55:18 AM PAGE - 4