Dell Force10 S2410 Schnellstart-Handbuch - Seite 13

Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Server Dell Force10 S2410 herunter. Dell Force10 S2410 31 Seiten. Installing the s2410 system
Auch für Dell Force10 S2410: Handbuch (42 seiten)

Step
Task
Position the XFP so it is in the upright position (XFPs on the bottom
1
(even-numbered ports) are upside down; odd-numbered ports (on top)
install right-side up), with the bail latch on top in the closed position, as
shown here. For details on XFP installation, see the instruction that
accompanies the XFP.
Insert the XFP gently into the port until it snaps into place. (The design
2
of the XFP prevents it from seating incorrectly.)
The XFP transceiver contains Rx and Tx labels on the two fiber optic
3
connections, and the connections have keyways that prevent inserting
the cables incorrectly.
CAUTION: Before connecting a transceiver to a source, check the receive
power of the transceiver with an optical power meter. Generally, Dell Force10
specified optics are not to be subjected to receive power higher than that
stipulated by the optic specification. If the optic is exposed to optical power in
excess of the specification, there is a high likelihood that it will be damaged.
Optical specifications for Dell Force10 branded devices are at the following
URL: http://www.force10networks.com/products/mediaspecifications.asp
S2410 Specifications

Chassis Physical Design

Parameter
Height
S2410P
1.73 inches (4.4 cm)
S2410CP
1.73 inches (4.4 cm)
Installing the Hardware
9