Dell S3100 Series Handbuch "Erste Schritte - Seite 30

Blättern Sie online oder laden Sie pdf Handbuch "Erste Schritte für Lagerung Dell S3100 Series herunter. Dell S3100 Series 46 Seiten.
Auch für Dell S3100 Series: Installationshandbuch (45 seiten), Handbuch "Erste Schritte (27 seiten)

Dell S3100 Series Handbuch
Figure 21. 1U Tool-Less Configuration

Configuring a Two-Post Flush-Mount

To install your switch using a two-post flush-mount configuration, follow these steps.
1.
For this configuration, remove the castings from the front side of each ReadyRails assembly. See item
1 in the following illustration. To remove the two screws from each front flange ear (on the switch
side of the rail) and remove each casting, use a Torx driver. Retain the castings for future rack
requirements. It is not necessary to remove the rear flange castings.
2.
Attach one rail to the front post flange with two user-supplied screws. See item 2 in the following
illustration.
3.
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post
flange with two user-supplied screws. See item 3 in the following illustration.
4.
Repeat this procedure for the second rail.
30
Installation