Dell S3100 Series Aan de slag handleiding - Pagina 30
Blader online of download pdf Aan de slag handleiding voor {categorie_naam} Dell S3100 Series. Dell S3100 Series 46 pagina's.
Ook voor Dell S3100 Series: Installatiehandleiding (45 pagina's), Aan de slag handleiding (27 pagina's)
Figure 21. 1U Tool-Less Configuration
Configuring a Two-Post Flush-Mount
To install your switch using a two-post flush-mount configuration, follow these steps.
1.
For this configuration, remove the castings from the front side of each ReadyRails assembly. See item
1 in the following illustration. To remove the two screws from each front flange ear (on the switch
side of the rail) and remove each casting, use a Torx driver. Retain the castings for future rack
requirements. It is not necessary to remove the rear flange castings.
2.
Attach one rail to the front post flange with two user-supplied screws. See item 2 in the following
illustration.
3.
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post
flange with two user-supplied screws. See item 3 in the following illustration.
4.
Repeat this procedure for the second rail.
30
Installation