Dell Networking Z9500 Installationshandbuch - Seite 33
Blättern Sie online oder laden Sie pdf Installationshandbuch für Schalter Dell Networking Z9500 herunter. Dell Networking Z9500 47 Seiten. Z9500 switch
Auch für Dell Networking Z9500: Handbuch "Erste Schritte (34 seiten)
Installing the Cable Management System for Direct Attach Copper (DAC)
Cables
1.
Secure the cable management system into place on the 4–post rack frame above the I/O side of the
chassis by inserting screws and tightening with a #2 Phillips screwdriver.
Figure 11. Installing the Cable Management System for DAC Cables
1.
Pin rack unit for DAC cable routing
2.
Insert a cable in a Z9500 port. then route the DAC cables up and along the line-card face between
the larger pins directly above the card. Position the cables so they follow the channel marked in the
figure below and exit to the right or left, depending on the chassis slot location. The cables should
emerge from right and left side of the panel.
Z9500 Installation
2.
Rack unit for DAC cable routing
33