Dell Networking Z9500 Manuale di installazione - Pagina 33

Sfoglia online o scarica il pdf Manuale di installazione per Interruttore Dell Networking Z9500. Dell Networking Z9500 47. Z9500 switch
Anche per Dell Networking Z9500: Manuale introduttivo (34 pagine)

Dell Networking Z9500 Manuale di installazione
Installing the Cable Management System for Direct Attach Copper (DAC)
Cables
1.
Secure the cable management system into place on the 4–post rack frame above the I/O side of the
chassis by inserting screws and tightening with a #2 Phillips screwdriver.
Figure 11. Installing the Cable Management System for DAC Cables
1.
Pin rack unit for DAC cable routing
2.
Insert a cable in a Z9500 port. then route the DAC cables up and along the line-card face between
the larger pins directly above the card. Position the cables so they follow the channel marked in the
figure below and exit to the right or left, depending on the chassis slot location. The cables should
emerge from right and left side of the panel.
Z9500 Installation
2.
Rack unit for DAC cable routing
33