Dell PowerConnect 5548 Handbuch "Erste Schritte - Seite 15
Blättern Sie online oder laden Sie pdf Handbuch "Erste Schritte für Schalter Dell PowerConnect 5548 herunter. Dell PowerConnect 5548 20 Seiten. Powerconnect 5500 series
Auch für Dell PowerConnect 5548: Anmerkungen zur Veröffentlichung (15 seiten)
Booting the Switch
After the local terminal is connected, turn on power. The switch then goes
through power-on self-test (POST). POST runs every time the switch is
started and checks hardware components, to determine if the switch is
operational before completely booting. If the system detects a critical
problem, the boot process stops. If POST passes successfully, a valid
executable image is loaded into RAM. POST messages are displayed on the
terminal and indicate test success or failure.
The boot process runs for approximately 40-45seconds.
When the boot process completes, the following LEDs are lit, as shown in
Figure 3-2:
•
Power
•
Status
•
Fan (should be green)
•
RPS (if it is being used)
Figure 3-2. Initial LEDs
Power Status
Configuring the Switch
Fan
RPS
15