Dell PowerEdge 350 Installationshandbuch - Seite 15

Blättern Sie online oder laden Sie pdf Installationshandbuch für Schalter Dell PowerEdge 350 herunter. Dell PowerEdge 350 32 Seiten. Wake-on-lan (wol) support on dell servers
Auch für Dell PowerEdge 350: Aktualisierung der Systemdiagnoseinformationen (2 seiten), Information Update (30 seiten), Hardware-Installation (22 seiten), Handbuch (15 seiten)

Dell PowerEdge 350 Installationshandbuch
support.dell.com

Installing the Inner Rails on the System Chassis

1.
Locate the two inner rails and position one to the side of the chassis (see
Figure 1-7).
Ensure that the flat end of the inside rail is toward the front of the chassis and
that the end with two threaded holes is located at the back of the chassis. The
flat central part of the inside rail must be facing the chassis, with the raised upper
and lower rail surface facing outward (see Figure 1-7).
Figure 1-7. Securing the Inner Rails to the System Chassis
2.
Secure each inner rail to the chassis using two 10-32 x 0.25-inch flat-head screws.

Installing the System in the Rack

CAUTION: Due to the size and weight of the system, never attempt to install
the system by yourself.
1.
Remove the optional bezel from the system front panel. Press the tab on each
end of the bezel and pull the bezel straight out from the chassis.
2.
Lift the system into position in front of the installed mounting bracket.
Rack Installation Guide
1-9