Dell PowerEdge 350 Installationshandbuch - Seite 29
Blättern Sie online oder laden Sie pdf Installationshandbuch für Schalter Dell PowerEdge 350 herunter. Dell PowerEdge 350 32 Seiten. Wake-on-lan (wol) support on dell servers
Auch für Dell PowerEdge 350: Aktualisierung der Systemdiagnoseinformationen (2 seiten), Information Update (30 seiten), Hardware-Installation (22 seiten), Handbuch (15 seiten)
support.dell.com
captive
fastener
Figure 1-20. Installing the Cable-Management Arm
2.
Align the free end of the cable-management arm (the end with the pin and cap-
tive thumbscrew) to the back end of the right (or left) side inner rail (as viewed
from the back) of the system.
3.
Secure the cable-management arm to the inner rail with the captive thumbscrew
(see Figure 1-20).
4.
Attach the input/output (I/O) cables to their respective expansion cards on the
back of the system.
5.
Connect the remaining cables to the system.
For details, see your system's Installation and Troubleshooting Guide and User's
Guide.
6.
Secure the cables to the cable-management arm:
a.
After connecting the cables to the system, unscrew the thumbscrews that
secure the front of the server to the front vertical rail.
b.
Slide the system forward to the fully extended position.
c.
Route the cables along the cable-management arm, allowing some additional
cable slack at the hinge positions, and secure the cables to the cable-
management arm with the Velcro straps attached to the cable-management
arm.
pin
Rack Installation Guide
1-23