Dell S3100 Series Handbuch "Erste Schritte - Seite 33
Blättern Sie online oder laden Sie pdf Handbuch "Erste Schritte für Schalter Dell S3100 Series herunter. Dell S3100 Series 46 Seiten.
Auch für Dell S3100 Series: Installationshandbuch (45 seiten), Handbuch "Erste Schritte (27 seiten)
Figure 24. Four-Post Threaded Configuration
Installing a 1U Two-Post
You can install the switch in 1U two-post (flush and center) configurations. Slide the system into the rails
in the same manner as the four-post configurations.
Installing a 1U Front-Rack
To install the switch in a 1U front-rack configuration, configure the rails that are attached to the system.
1.
Attach the switch rails (inner chassis members) to the switch. Item 3 in the following illustration
shows the detail for the front standoff with the locking tab.
Installation
33