Dell S3100 Series Panduan Memulai - Halaman 33
Jelajahi secara online atau unduh pdf Panduan Memulai untuk Beralih Dell S3100 Series. Dell S3100 Series 46 halaman.
Juga untuk Dell S3100 Series: Panduan Instalasi (45 halaman), Panduan Memulai (27 halaman)
Figure 24. Four-Post Threaded Configuration
Installing a 1U Two-Post
You can install the switch in 1U two-post (flush and center) configurations. Slide the system into the rails
in the same manner as the four-post configurations.
Installing a 1U Front-Rack
To install the switch in a 1U front-rack configuration, configure the rails that are attached to the system.
1.
Attach the switch rails (inner chassis members) to the switch. Item 3 in the following illustration
shows the detail for the front standoff with the locking tab.
Installation
33