Dell S4248FB-ON Setup-Handbuch - Seite 16
Blättern Sie online oder laden Sie pdf Setup-Handbuch für Schalter Dell S4248FB-ON herunter. Dell S4248FB-ON 29 Seiten. S4200-on series
Auch für Dell S4248FB-ON: Installationshandbuch (47 seiten)

To remove the two screws from each front flange ear on the switch side of the rail and
remove each latch casting, use a Torx screwdriver. Retain the latch castings for future
rack requirements. It is not necessary to remove the back flange castings.
Figure 4. Two-post flush-mount installation
2
Attach one rail to the front post flange with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger
bracket to the post flange with two user-supplied screws, item 3.
4
Repeat this procedure for the second rail.
16
S5048F-ON switch installation