Dell S6000-ON Installationshandbuch - Seite 18

Blättern Sie online oder laden Sie pdf Installationshandbuch für Schalter Dell S6000-ON herunter. Dell S6000-ON 41 Seiten. Open networking
Auch für Dell S6000-ON: Handbuch "Erste Schritte (26 seiten), Handbuch zur Fehlersuche (29 seiten)

Dell S6000-ON Installationshandbuch
Figure 7. Two-post flush-mount configuration
2
Attach one rail to the front post flange with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied
screws, item 3.
4
Repeat this procedure for the second rail.

Two-post center-mount configuration

CAUTION:
Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied
screws, item 1.
18
S6000–ON installation