Dell S6000-ON Panduan Instalasi - Halaman 18
Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Beralih Dell S6000-ON. Dell S6000-ON 41 halaman. Open networking
Juga untuk Dell S6000-ON: Panduan Memulai (26 halaman), Panduan Pemecahan Masalah (29 halaman)
Figure 7. Two-post flush-mount configuration
2
Attach one rail to the front post flange with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied
screws, item 3.
4
Repeat this procedure for the second rail.
Two-post center-mount configuration
CAUTION:
Your system is not NEBS Earthquake Z4-compliant if you use this installation method.
1
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied
screws, item 1.
18
S6000–ON installation