Miele DDG 102 Betriebs- und Installationshandbuch - Seite 10
Blättern Sie online oder laden Sie pdf Betriebs- und Installationshandbuch für Lüftungshaube Miele DDG 102 herunter. Miele DDG 102 24 Seiten. External motor roof installation
Auch für Miele DDG 102: Betriebs- und Installationsanleitung (28 seiten), Installationsanleitung Handbuch (28 seiten), Installationsanleitung Handbuch (28 seiten)
Installation
^ Make a C 185 mm hole in the wall.
^ Push the telescopic wall pipe into the
hole so that it is sitting flush.
The telescopic wall pipe will make it
easier to feed the control cable and
the flexible ducting through later on.
^ Position the motor unit fixing bracket
on the outside wall with the control
cable connection at the bottom.
^ Mark the positions for three drill holes.
^ Drill three 8 mm C holes and plug
with S8 plugs.
10
^ Connect the 3 mountings through the
fixing holes in the bracket as illustrated.
^ Position the bracket onto the outside
wall again and feed the control cable
with the six-pole connectors through
the telescopic wall pipe into the
house.
^ If equipotential bonding is required,
pull the earth cable through the gap
provided.
Equipotential bonding is required if
the control cable is to be extended
by more than the extension cable
supplied (see "Electrical connection").