HP 3000 Series Handbuch - Seite 22
Blättern Sie online oder laden Sie pdf Handbuch für Desktop HP 3000 Series herunter. HP 3000 Series 25 Seiten. 9x9 to k class conversion
Auch für HP 3000 Series: Upgrade-Handbuch (19 seiten), Handbuch (20 seiten), Installationshandbuch (42 seiten)
22
• Verifying that SNA Link is properly installed
and configured prior to this installation of
SNA DHCF/iX unless SNA Link will be
installed at the same time.
• Updating the HP 3000 system to the proper
release level and installing the SNA
DHCF/iX software using AUTOINST. Refer
to the HP 3000 MPE/iX Installation and
Update Manual (36123-90001).
• Verifying that all of the necessary software
modules have been successfully installed by
AUTOINST and are at the correct version
levels using the NMMAINT.PUB.SYS utility.
• Performing full system backups as neces-
sary and ensuring that the HP 3000 system
and personnel with HP 3000 system man-
agement knowledge are available when HP
is onsite to complete the minimum configu-
ration of SNA DHCF/iX.
The customer is also responsible for
completing the configuration in order to fully
integrate SNA DHCF/iX into the existing
customer network after HP has completed the
minimum configuration of SNA DHCF/iX.
HP Responsibility
Following the installation of SNA DHCF/iX,
HP is responsible for the following:
• Confirming that all of the necessary soft-
ware modules have been installed and are at
the correct version level.
• Configuring the SNA DHCF/iX product to a
minimum configuration (1 LU) in order to
verify software and hardware functionality.
• Verifying the SNA DHCF/iX configuration by
issuing the DHCFCONTROL START com-
mand and ensuring that the LU to SSCP
session becomes active for the LU that was
configured.
These steps complete HP's portion of the
installation and minimum configuration of
SNA DHCF/iX.
Additional Implementation
Assistance
For implementation needs that go beyond
installation, the customer can either provide
self-support or can purchase additional
services from HP. These services include
Network Startup and HP ConsultLine. In
addition, the customer can also purchase
service from HP on a time-and-materials basis.
Network Startup includes implementation
scheduling and coordination assistance,
network configuration and verification testing,
and network documentation.
Ordering Information
Product/Option
Number
Description
A5563A
SNA Link Interface Card
010
RS-232-C Synchronous
Modem Connection
020
V35 Synchronous
Modem Connection
025
Autodial Connection
0D1
Factory Integration
Required for SNA/SDLC, SNA/Services bundle, NS
Point-to-Point, RJE, BSC/iX Softwares (option 001
CIB/CIO become obsolete)
Product/Option
Number
Description
30292B
SNA Services License,
Software and Documentation
310
Tier 1 License (also applies to 315,
320 Tier 2, 3 systems)
330
Tier 4 License (also applies to 335
Tier 5 systems)
340
Tier 6 License (also applies to 350
Tier 7 systems)
0CD
Upgrade credit Tier 1
0CF
Upgrade credit Tier 4
Requires A5563A.
Includes former 30202A, 30293A, 30294A, and 36935A.
Customers must also order the MPE media
product (51543B) on MPE/iX 5.5 Express 7 or
later, or MPE/iX 6.0 Express 1 or later. This is
required to receive software for this product.
HP 3000
Bus ness
Servers