ABB CPS6000 Schnellstart-Handbuch - Seite 3

Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Industrielle Ausrüstung ABB CPS6000 herunter. ABB CPS6000 6 Seiten.
Auch für ABB CPS6000: Schnellstart-Handbuch (8 seiten)

ABB CPS6000 Schnellstart-Handbuch
QUICK START GUIDE

Step 9 - Controller Connections

1.
J1 Alarms and Inputs - Connect to office alarms and signals.
2.
J2 LAN - Connect to Ethernet network (.can also be used as a Craft Port when configured as a Server.)
Office alarm connector. See
Information: Office Alarm
Connections.
Craft USB Port

Step 6 - Rectifier Installation

1.
Unlatch the handle as shown above.
2.
Firmly push the rectifier into the rectifier slot until the latch pops most of the way up.
3.
Push the latch into the latched position.
Page 3
© 2021 ABB. All rights reserved.
J2 - see Information: Battery Temp TP Monitor
Press Latch/
Handle
Release Button IN
Latch/Handle in
Latched Position
Latch/Handle
Springs Out
Part Way
Press Latch/
Handle
Local Port LAN