Olympus CIX100 Installationshandbuch - Seite 4

Blättern Sie online oder laden Sie pdf Installationshandbuch für Laborausrüstung Olympus CIX100 herunter. Olympus CIX100 14 Seiten. Cleanliness inspector system
Auch für Olympus CIX100: Handbuch zur Systemeinrichtung (38 seiten), Anleitung Handbuch (46 seiten)

Olympus CIX100 Installationshandbuch
Solution CIX Height Measurement
1

CIX Height Measurement Solution

This manual describes the installation of the objective as well as the
installation and configuration of the software for the CIX Height
Measurement Solution. Read this manual carefully before installing and
configuring the system.
1.1

Safety instructions

Caution
1.2

Installing the objective

Installation Manual
Pinching hazard
When the stage moves, gaps appear. This creates a pinching hazard.
Make sure that you are not within the stage's range of movement
when it is moving.
Try never to put your hands or fingers into any gaps.
1. Use the joystick to move the stage all the way forwards to the
mounting position.
2. Remove the multi-sample holder.
3. Lower the stage to its lowest position by rotating the coarse focus
adjustment knob (1).
4