Olympus CIX100 Manual de instalação - Página 4

Procurar online ou descarregar pdf Manual de instalação para Equipamento de laboratório Olympus CIX100. Olympus CIX100 14 páginas. Cleanliness inspector system
Também para Olympus CIX100: Manual de configuração de sistemas (38 páginas), Manual de instruções (46 páginas)

Olympus CIX100 Manual de instalação
Solution CIX Height Measurement
1

CIX Height Measurement Solution

This manual describes the installation of the objective as well as the
installation and configuration of the software for the CIX Height
Measurement Solution. Read this manual carefully before installing and
configuring the system.
1.1

Safety instructions

Caution
1.2

Installing the objective

Installation Manual
Pinching hazard
When the stage moves, gaps appear. This creates a pinching hazard.
Make sure that you are not within the stage's range of movement
when it is moving.
Try never to put your hands or fingers into any gaps.
1. Use the joystick to move the stage all the way forwards to the
mounting position.
2. Remove the multi-sample holder.
3. Lower the stage to its lowest position by rotating the coarse focus
adjustment knob (1).
4