Ricoh Container Stacker Anweisungen zum Auspacken und Einrichten - Seite 22
Blättern Sie online oder laden Sie pdf Anweisungen zum Auspacken und Einrichten für Drucker-Zubehör Ricoh Container Stacker herunter. Ricoh Container Stacker 49 Seiten.
12. Remove the OC P/K ass'y from the Printer. Remove the CP411 P/K and CP P/K
holder (70 ppm only).
13. Remove the OC P/K ass'y and CP P/K holder from the Printer (92/184 ppm only).
14. Remove the nv-RAM from the CP411 P/K using an IC gripper. Install the
removed nv-RAM into the CP417 P/K (70 ppm only)
CST AC Cable
15. Connect the CST AC cable coming from the Container Stacker to J236 on the
power supply of the Printer (Connection 1 on the figure below). At this time,
connect the CE AC cable that was disconnected from J236 to the connector of the
CST AC cable (Connection 2 on the figure below).
16. Mount the CST FG cable coming from Container Stacker side on the Printer
frame using an M4 screw (Connection 3 on the following illustration).
17. Install the CP417 P/K on the CP P/K holder, and then install it and the board in
the Printer. (70 ppm only)
18. Install the CP P/K holder and OC P/K ass'y in the Printer (92/184 ppm only)
19. Connect the FNS IF cable of the 20 pin black connector coming from the Printer
to the J680 connector of ST09X board in Container Stacker (Connection 4 on the
figure below). Do not use the 4 pin white connector (Disconnection 2 on the
following illustration).
CP P/K holder
CPXXX P/K
CST FG Cable
Container Stacker Installation Instructions 1-17
M4 Screw
OC P/K ass'y
Dent side
nv-RAM
M4 Screw
M4 Screw