Cisco 5400 Series Installation von - Seite 5
Blättern Sie online oder laden Sie pdf Installation von für Netzwerk-Hardware Cisco 5400 Series herunter. Cisco 5400 Series 6 Seiten. Enterprise network compute system
Installing the Device
Figure 5: Wall Mounting the Server
Powering On the Server
Note
When the power cord is connected to the system, both the management controller (CIMC) and the server is
automatically powered on. When the system is powered on, do not press the front-panel power button. If you
press the front-panel power button, it will power off the server, but the management controller (CIMC)
continues to be operational. You must press this button again to power on the server.
1. Attach the power cord to the power supply unit in the server and then attach the other end of the power
chord to the grounded power outlet.
2. Wait for approximately three minutes.
3. Verify the power status of the system by looking at the system power status LED. The power status LED
blinks in amber color during initial boot up and in solid amber when the system reaches the standby power
mode.
Powering On the Server
Installing the Device
5