Cisco UCS X10c Installations- und Wartungshandbuch - Seite 34

Blättern Sie online oder laden Sie pdf Installations- und Wartungshandbuch für Netzwerk-Hardware Cisco UCS X10c herunter. Cisco UCS X10c 38 Seiten. Front mezzanine gpu module

Cisco UCS X10c Installations- und Wartungshandbuch

Recycling the PCB Assembly (PCBA)

Recycling the PCB Assembly (PCBA)
Each front mezzanine assembly has four printed circuit boards (PCBs) that are connected to the sheet metal
cage by 15 M3 screws.
To remove the PCBs, you must:
• Remove the compute node that contains the front mezzanine module from its chassis
• Remove the front mezzanine assembly from its compute node.
• Disassemble and remove additional parts to gain access to the PCBs.
• Disconnect the PCBs from the sheet metal to recycle them.
• Recycle each front mezzanine assembly in the Cisco UCS X-Series server chassis.
Use the following procedure to recycle the PCBs from the UCS front mezzanine GPU module.
Before you begin
Note
Cisco UCS X10c Front Mezzanine GPU Module Installation and Service Guide
26
For Recyclers Only! This procedure is not a standard field-service option. This procedure is for recyclers
who will be reclaiming the electronics for proper disposal to comply with local eco design and e-waste
regulations.
Servicing the GPU Module