Cisco Firepower 2130 Installation & Wartung - Seite 13
Blättern Sie online oder laden Sie pdf Installation & Wartung für Server Cisco Firepower 2130 herunter. Cisco Firepower 2130 26 Seiten. Rack-mount and ground the chassis
Auch für Cisco Firepower 2130: Handbuch (12 seiten), Handbuch für den Einsatz (8 seiten), Erste Schritte (42 seiten)
Installation, Maintenance, and Upgrade
Do not strip more than the recommended length of wire because doing so could leave the wire exposed from
Note
the terminal block.
Figure 5: Stripped DC Input Source Wire
1
Strip the wires to approximately 0.39 inch (10 mm) +
0.02 inch (0.5 mm)
Step 4
Insert the exposed wire into the terminal block. Make sure that you cannot see any wire lead outside the plastic cover.
Only wires with insulation should extend from the terminal block.
Step 5
Use a screwdriver to tighten the terminal block captive screws.
Do not over torque the terminal block captive screws. Make sure that the connection is snug, but the wire is
Caution
not crushed. Verify by tugging lightly on each wire to make sure that they do not move.
Connect the DC Power Supply Module
—
Installation, Maintenance, and Upgrade
13