Installing the Server In a Rack
Figure 2-2
1
6
1
Front-right rack post
2
Rear-right rack post
3
Slide-rail assembly
Attach the second slide-rail assembly to the opposite side of the rack. Ensure that the two slide-rail
c.
assemblies are level and at the same height with each other.
Pull the inner slide rails on each assembly out toward the rack front until they hit the internal stops
d.
and lock in place.
Insert the server into the slide rails (see
Step 2
This server weighs approximately 60 pounds (28 kilograms) when fully loaded with components. We
Caution
recommend that you use a minimum of two people when lifting the server. Attempting this procedure
alone could result in personal injury or equipment damage.
Note
a.
Align the inner rails that are attached to the server sides with the front ends of the empty slide rails.
b.
Push the server into the slide rails until it stops at the internal stops.
c.
Push in the slide rail locking clip (item 2) on each inner rail, and then continue pushing the server
into the rack until its front flanges latch onto the rack posts.
Cisco UCS C240 Server Installation and Service Guide
2-6
Attaching a Slide-Rail Assembly
3
The inner rails are pre-attached to the sides of the server at the factory. You can order
replacement inner rails if these are damaged or lost (Cisco PID UCSC-RAIL-2U-I).
4
4
Length-adjustment bracket
5
Mounting pegs (two on each end of assembly)
6
Locking clips (one on each end of assembly)
Figure
2-3):
Chapter 2
Installing the Server
2
6
OL-25761-01