CUBE in-a-box V1.series Detaillierte Montageanleitung - Seite 4
Blättern Sie online oder laden Sie pdf Detaillierte Montageanleitung für Inneneinrichtung CUBE in-a-box V1.series herunter. CUBE in-a-box V1.series 6 Seiten.
5
6
7
8
9
- 2 -
Insert each filler designed
to hide the empty space on
both posts B, as per
pictures, right and left.
Assemble the 2 plastic
wire-guides and make sure
the 4 bracket have their big
chromed screws in place.
Slide/adjust at first the 2
wire-guides into posts B
where you will need them,
preferably under work top
level.
Adjust the brackets to the
mark level (dot) showing on
each post.
Display brackets on corner
and on all end posts.
You just need to tighten the
big chromed-screw to make
it hold.
TIP: if no mark, adjust the
bracket supports at 28-1/4
inches high.
The 4 brackets are now
locked at the same height
and ready to receive the
work top.
Display the work-top on the
support brackets.