CUBE in-a-box V1.series 자세한 조립 지침 - 페이지 4

{카테고리_이름} CUBE in-a-box V1.series에 대한 자세한 조립 지침을 온라인으로 검색하거나 PDF를 다운로드하세요. CUBE in-a-box V1.series 6 페이지.

5
6
7
8
9
- 2 -
Insert each filler designed
to hide the empty space on
both posts B, as per
pictures, right and left.
Assemble the 2 plastic
wire-guides and make sure
the 4 bracket have their big
chromed screws in place.
Slide/adjust at first the 2
wire-guides into posts B
where you will need them,
preferably under work top
level.
Adjust the brackets to the
mark level (dot) showing on
each post.
Display brackets on corner
and on all end posts.
You just need to tighten the
big chromed-screw to make
it hold.
TIP: if no mark, adjust the
bracket supports at 28-1/4
inches high.
The 4 brackets are now
locked at the same height
and ready to receive the
work top.
Display the work-top on the
support brackets.