CUBE in-a-box V3.Series Montageanleitung Handbuch - Seite 4

Blättern Sie online oder laden Sie pdf Montageanleitung Handbuch für Inneneinrichtung CUBE in-a-box V3.Series herunter. CUBE in-a-box V3.Series 6 Seiten.

CUBE in-a-box V3.Series Montageanleitung Handbuch
7
8
9
10
11
12
13
- 3 -
Slide whiteboard-panel 7T
on top of the last rail-panel
6 between posts B and C.
Make sure all the panels are
stacked all the way down in
the posts.
Assemble the two
wire-guides and slide them
into posts where you will
need them, preferably
under work top level.
Check and assemble all
brackets and cantilevers.
Use big chromed-screws
here.
Adjust the brackets and
cantilevers to the mark level
(dot) on each post or at
28-1/4 inches high.
Both cantilevers go on
linear posts C.
Repeat the operation for all
brackets/cantilevers.
You just need to tighten the
big chromed-screw to make
it hold.
Display brackets on all
corners and on all end
posts.
Insert each filler designed
to hide the empty space at
the top of posts B and C, as
per pictures are showing.