Refractory internal panels
During the normal operation of your ACR stove, the refractory panels will experience heating
and cooling. Sometimes minor hairline cracks can occur. All ACR stoves have a steel or cast
iron structure behind the panels and therefore even if the cracks get larger, the stove will still
operate safely.
It is advisable to replace the internal panels when:
• The cracks are greater than 3mm.
• The surface of the refractory panel has eroded more than 25% of it's original thickness, or
• When the panel starts to crumble and fall apart in chunks.
To prevent the issue from happening and prolong the life of your internal panels, the
homeowner should "burn in" the refractory panels in the new appliance by building small
kindling fires to begin with and then gradually working up to a larger fire. When adding more
fuel to the fire, caution should be used to prevent excessive mechanical damage to the
panels.
ACR Heat Products bears no responsibility for the loss or damage of any kind to the internal
panels during or after installation or during the normal operation of the appliance.
Use only replacement parts recommended by the manufacturer.
Woodpecker WP4 Refractory panels:
Woodpecker WP5Q-P/LS Refractory panels:
Woodpecker WP5 Refractory panels:
Woodpecker WP5 PLUS Refractory panels:
20 of 32
Commissioning Check List
Please tick boxes when each procedure is completed
Ensure that the serial number has been recorded on the
front of the manual for future use
Visual inspection of appliance and flue ensure that all
internal components are fitted correctly (these may have
shifted in transit)
Ensure the door seals are in good condition and that the
glass is secured correctly in the door (do not over tighten
the glass as this will prohibit its expansion and could
cause the glass to crack)
Test on flue including satisfactory smoke test: Record
flue draught reading
Spillage test preformed in accordance with available
guidance
Check socket joints and seals on the flue and
appliance
Instruct user on correct fuels and fuel storage
Ensure the customer is aware that fumes may be given
off during the first firings as the paint cures
Instruct user on essential maintenance in particular
annual maintenance of appliance and flue
Hand over user instructions & demonstrate operation
and all controls to the user
Ensure that a Notice Plate has been completed and fixed
in position
Ensure that an approved Carbon Monoxide alarm has
been fitted in correct location as per Building Regs Doc J
Installation Company:
Installation Engineers Name: