Da-Lite TENSIONED CONTOUR ELECTROL Libro de instrucciones - Página 4
Navegue en línea o descargue pdf Libro de instrucciones para Accesorios para proyectores Da-Lite TENSIONED CONTOUR ELECTROL. Da-Lite TENSIONED CONTOUR ELECTROL 13 páginas. Installer friendly features
También para Da-Lite TENSIONED CONTOUR ELECTROL: Libro de instrucciones (9 páginas), Manual del instalador (2 páginas), Manual de instrucciones (9 páginas), Libro de instrucciones (13 páginas)
ELECTRICAL INSTALLATION
1. open the junction box on the left end of the case using a #2
Phillips screwdriver. Install electrical connections that apply
to your unit. Make sure to review the wiring diagram for
proper hook up. Replace the junction box cover.
NoTe: Must be installed in accordance with the
requirements of the Local Building Codes, the Canadian
electrical Code (CeC), CAN/CSA C22.1 and the National
electric Code (NeC), NFPA 70.
2. Test installation by running screen up and down a few times.
Be prepared to stop screen should any objects obstruct the
movement of the screen. To prevent damage to the motor,
the standard duty cycle is 1 minute on and 3 minutes off.
4
Junction
Box Cover
Figure 5