ASTLES SENSOLUTION C800 Instalación y funcionamiento - Página 6

Navegue en línea o descargue pdf Instalación y funcionamiento para Instrumentos de medida ASTLES SENSOLUTION C800. ASTLES SENSOLUTION C800 20 páginas.

C800 Analyser Operating Manual

3. Electrical Installation

3.1. Power supply Requirements

The C800 requires a 24V ±10% dc supply. Other devices such as chart recorders and PLCs may be
connected in series. Use screened cable if the 4-20mA conductivity signal is required.
3.2. 24V Supply Wiring

3.2.1. Connection via an M12 Socket

To connect the analyser via an M12 socket, wire it as shown:
All three wires from the M12 socket must pass through a gland in the bottom of the analyser.
902857-A - C800 Analyser Operating Manual.docx
6