ASTLES SENSOLUTION C800 Installation und Betrieb - Seite 6
Blättern Sie online oder laden Sie pdf Installation und Betrieb für Messgeräte ASTLES SENSOLUTION C800 herunter. ASTLES SENSOLUTION C800 20 Seiten.
C800 Analyser Operating Manual
3. Electrical Installation
3.1. Power supply Requirements
The C800 requires a 24V ±10% dc supply. Other devices such as chart recorders and PLCs may be
connected in series. Use screened cable if the 4-20mA conductivity signal is required.
3.2. 24V Supply Wiring
3.2.1. Connection via an M12 Socket
To connect the analyser via an M12 socket, wire it as shown:
All three wires from the M12 socket must pass through a gland in the bottom of the analyser.
902857-A - C800 Analyser Operating Manual.docx
6