BD FACSAria II Manual de consulta rápida - Página 2

Navegue en línea o descargue pdf Manual de consulta rápida para Equipos de laboratorio BD FACSAria II. BD FACSAria II 6 páginas.

Caution: Do not run fluidics startup with the air and fluid lines
connected to the ethanol shutdown tank. This can cause damage to
the system. Always verify the lines are connected to the sheath tank.
7
Start the stream.
a
Click the Sorting button (
the Breakoff and Side Stream windows.
b
Click the Stream button (
stream.
8
Check the stream position in the waste aspirator and inspect the stream
image in the Breakoff window.
If you see any dripping or spraying or the stream appears abnormal,
turn off the stream and refer to Troubleshooting the Stream in
Chapter 7 in the user's guide.
9
Select a new Sort Setup mode, if necessary.
Sort Setup
70 micron
85 micron
100 micron
130 micron
10
Adjust the Amplitude to achieve fast-merging satellites within 6 drops.
For troubleshooting assistance, see Troubleshooting the Breakoff on
page 5 or refer to Sorting Troubleshooting in Chapter 7 in the user's
guide.
11
Enter the generated value as the Drop 1 target.
12
Turn on the Sweet Spot when the drop pattern is stable.
Nozzle (micron)
70
85
100
130
) on the Workspace toolbar to display
) in the Breakoff window to turn on the
Default pressure (psi)
70
45
20
10
2