CommScope BUDI-2S-SP Instrucciones de instalación - Página 3

Navegue en línea o descargue pdf Instrucciones de instalación para Recinto CommScope BUDI-2S-SP. CommScope BUDI-2S-SP 8 páginas.

3.9
Route the aramid yarn along the feeder cable.
3.10
Close the cable holder with the cover. Check the orientation of
the arrow on the cover.
3.11
Install the cable holder into the box on the lowest position
(adjust the position depending on the cable diameter)..
3.12
Route the fibers of the feeder cable towards the splicing trays.
3