CommScope BUDI-2S-SP Kurulum Talimatı - Sayfa 3
Muhafaza CommScope BUDI-2S-SP için çevrimiçi göz atın veya pdf Kurulum Talimatı indirin. CommScope BUDI-2S-SP 8 sayfaları.
3.9
Route the aramid yarn along the feeder cable.
3.10
Close the cable holder with the cover. Check the orientation of
the arrow on the cover.
3.11
Install the cable holder into the box on the lowest position
(adjust the position depending on the cable diameter)..
3.12
Route the fibers of the feeder cable towards the splicing trays.
3