Anzzi SB-AZ013WL Manual de instalación y funcionamiento - Página 9
Navegue en línea o descargue pdf Manual de instalación y funcionamiento para Productos de fontanería Anzzi SB-AZ013WL. Anzzi SB-AZ013WL 14 páginas. Shower base
También para Anzzi SB-AZ013WL: Manual de instalación y mantenimiento (8 páginas)
ATTENTION
The following steps are for the rectangle
●
shower tray.
STEP 1
Ensure that the floor and the studs are at right angles.Provide a 5"×5" opening in the subfloor
●
for the drain. The 2" PVC waste pipe should extend above the surface of the sub-floor according
to the drain installation instructions and the height of the Shower Tray.
Mark unit position on floor and through drain opening.
●
Mark the locations of the studs on the flange of the base.
●
These marks are used to verify base location after drain is installed. (Fig 1)
●
The pipe height (A) shall be determined according to the products on hand.
●
C
5"
(12.7 cm)
A
7