Cascade 20E Manual de instrucciones de instalación - Página 8

Navegue en línea o descargue pdf Manual de instrucciones de instalación para Herramienta eléctrica Cascade 20E. Cascade 20E 14 páginas. Non-sideshifting & sideshifting clamps
También para Cascade 20E: Manual de instrucciones de instalación (11 páginas)

I
NSTALLATION
10
Cycle Clamp functions
NON-SIDESHIFTING CLAMPS
A
Release Arms
B
Clamp Arms
C
(not used)
D
(not used)
A
B
AUXILIARY VALVE
FUNCTIONS
6
With no load, cycle each Clamp function
several times.
Check for operation in accordance with
ITA (ISO) standards.
Clamp and lift a maximum load. Sideshift
left and right. Check for proper clamp
force, equal arm movement and ad-
equate speed. If necessary, adjust relief
valve cartridges (see Step 11).
Check for leaks at fittings, valve, manifold
and cylinders.
SIDESHIFTING CLAMPS
A
B
C
D
B
C
D
CL0461.ill
A
GA0005.ill
Sideshift Left
Sideshift Right
Release Arms
Clamp Arms
A
CL0085.ill
C
A
Tilt Forward
Hoist Down
Hoist Up Tilt Back
WARNING: Make sure all personnel are
clear of the Clamp during testing.
SIDESHIFTING CLAMPS WITH
SOLENOID VALVE
A
Sideshift Left
A
Release Arms
(press knob button)
B
Sideshift Right
B
Clamp Arms
(press knob button)
B
B
A
C
B D
A
CL0085.ill
A