Danfoss 176F4184 Manual de instalación - Página 11

Navegue en línea o descargue pdf Manual de instalación para Equipamiento industrial Danfoss 176F4184. Danfoss 176F4184 14 páginas. In-back/out-back cooling kit for fk09a/fb09a and fk10a/fb10a

In-back/Out-back Cooling Kit for FK09a/FB09a and FK10a/FB10a
Installation Guide
6.
Secure the bottom cover plate to the underside of the duct frame with 12 M5 nuts (for FK09a/FB09a) or 14 M5 nuts (for
FK10a/FB10a).
Torque to 2.3 Nm (20 in-lb).
7.
Place the duct front gasket on the front of the duct frame, making sure the holes in the frame and gasket align.
8.
Affix the top gasket to the top of the duct frame.
Wait to attach the front duct cover until the assembled duct is attached to the frequency converter.
1
2
3
4
5
6
Illustration 10: Lower Duct Assembly
1
Duct frame top gasket
2
Duct frame
3
Duct front gasket
4
Duct front cover
5
M5 nut
6
Drain tube
2.7 Installing the Lower Duct
After assembling the lower duct, use the following steps to attach it to the frequency converter.
Procedure
1.
Remove 6 screws (T25) from the base plate.
Keep the screws for installing the lower duct.
2.
Secure the top flange of the duct frame to the bottom of the frequency converter using the screws removed in step 1.
Danfoss A/S © 2023.09
7
Grill gasket
8
Back grill
9
Side gasket, left
10
Side gasket, right
11
Bottom gasket
12
Bottom cover plate
AN440656954288en-000101 / 136R0326 | 11
Installation
7
8
9
10
11
12