Galebreaker Bayscreen Manual de instrucciones de instalación y funcionamiento - Página 10

Navegue en línea o descargue pdf Manual de instrucciones de instalación y funcionamiento para Maquinaria agrícola Galebreaker Bayscreen. Galebreaker Bayscreen 16 páginas.

®
Bayscreen
under no circumstances use levers to add more tension. Should the hooks slide
on the pillars then a preventative 'stop' should be fastened to the building upright.
ATTENTION: Tension ratchets fully, lack of tension will cause
damage to the Bayscreen. Only tension by hand, use of levers
could cause damage to the ratchets.
ATTENTION: To ensure the ratchet functions correctly there must
be a minimum of 150mm webbing (for 50mm ratchet) or 100mm
webbing (25mm ratchet) around the ratchet barrel for secure &
permanent tensioning of the screen.
ATTENTION: Overloading the ratchet barrel with webbing will
restrict the tension you can apply to the screen due to an
increase in friction and a decrease in leverage. To free surplus
webbing pull ratchet release catch on handle and open 180
degrees until ratchet body is flat and pull on webbing strap.
Mounting Screens in Series
9.
When screens are installed in series they share a common pillar, the ratchet of
one screen can be set above or below the hook of the other screen creating an
offset. Alternatively they can be installed 'in line' as detailed in Figure 8(i)
(25mm webbing) and in Figure 8(ii) (50mm webbing).
10.
Install screens working from right to left as viewed from the side with the
webbing. When fitting the second screen, offer up the ratchet hook (D1 or D2)
to straddle the webbing of the previous screen and cut two slits in the fabric 4cm
long to coincide with the legs of the hook. Cut the material 1cm back past the
edge of the upright so that the hook contacts on the upright and does not put
load onto the fabric. Pass the ratchet hook through the slits and onto the
upright, then tension the screen as previously instructed.
-10-
Installation
ENG