highwood Pottsville Manual de montaje - Página 2

Navegue en línea o descargue pdf Manual de montaje para Césped y jardinería highwood Pottsville. highwood Pottsville 4 páginas.

Before you start
IMPORTANT Check for underground services with your local authorities BEFORE installation of this product.
They will typically mark out underground cables/gas etc at no charge.
Step 1
Set the fence in the desired location and carefully measure and
mark the ground where the center of each post will fall assuring that
each rail will set at a 45 degree angle as shown below.
45˚
Step 2
Install metal ground stake for center post
Measure and mark the half way point on Metal ground stake (E)
as shown in Figure 1 below. Place Stake (E) in desired location for
Center Post (B) and carefully use a hammer to drive it into ground.
Use level to make sure the stake is straight and plumb. Adjust as
needed and finish driving it into the ground using a small block of
wood on top of stake as shown in Figure 2 below. Install no deeper
than the half-way point.
Fig. #1
45˚
Fig. #2
Step 3
Set ground stake tabs into place
Use a flat head screwdriver and/or a set of pliers to bend the
locking tabs on Metal ground stake (E) into appropriately a
45 degree angle as shown in Figure 3 below.
Fig. #3
45˚