Dynojet Power Commander 3 Instrucciones de instalación - Página 3
Navegue en línea o descargue pdf Instrucciones de instalación para Accesorios para motocicletas Dynojet Power Commander 3. Dynojet Power Commander 3 4 páginas. For 2006-2008 suzuki m109r / c109r
También para Dynojet Power Commander 3: Instrucciones de instalación (2 páginas), Instrucciones de instalación (3 páginas)
Ground
330-411
www.powercommander.com
Unplug
7
Unplug the Throttle Position Sensor
connector (Fig. D).
This connector is located on the right hand
side of the throttle bodies and is GREY in
color.
8
Plug the PCIII connectors in-line of the
stock wiring harness and TPS
9
Route the ground wire from the PCIII thru
the front hole in the battery box.
10 Attach the ground wire from the PCIII to the
negative side of the battery (Fig. E).
11 Install the PCIII under the left hand side
cover. Zip tie the unit to the metal brace
near the ECU (Fig. F).
12 Reinstall air box and fuel tank.
06-08 Suzuki M109R - 3