Green Sun HydroFalls Manual del producto - Página 12

Navegue en línea o descargue pdf Manual del producto para Césped y jardinería Green Sun HydroFalls. Green Sun HydroFalls 15 páginas.

Horizontal installation for 2 or more units
Installation sequence as shown below:
5th flower pot
3rd flower pot
3rd flower pot
1st flower pot
2nd flower pot
1st flower pot
For a Horizontal installation
Mark on the wall the first unit with 4 hole positions (281mm x 90mm apart). Then mark the same hole positions
289mm next the first unit. Once the lower level is finish, user can mark the upper level positions 91mm above the
below level and so on. Refer to (Fig. 8)
Start with the lowest level mounting Brackets installation, then slide the planter body over it . Make sure there is
enough space for the planter to slide in. Make sure the lower level is finish before the user can start with the
upper level installation. Refer to (Fig. 8 & Fig. 8.1)
90 mm
91 mm
90 mm
91 mm
90 mm
47.5 mm
Fig. 8
Fig. 8.1
07
5th flower pot
6th flower pot
4th flower pot
3rd flower pot
4th flower pot
2nd flower pot
1st flower pot
2nd flower pot
281 mm
289 mm
281 mm
5th flower pot
6th flower pot
3th flower pot
4th flower pot
1st flower pot
2nd flower pot

Installing the Mounting Brackets

If installing into a sound masonry wall, use an 8mm drill
bit. Drill 4 holes 35mm deep and install the wall plugs.
Refer to (Fig. 9 & Fig. 9.1)
35 mm
8 mm
Fig. 9
Fig. 9.1
If installing into a sound timber structure, use a 3mm drill
bit to drill 4 holes 35mm deep. Refer to (Fig. 10)
35 mm
3 mm
Fig.10
Install the mounting brackets
using the screw provided. Make
sure to secure tightly so there is
no movement in the brackets.
Refer to (Fig. 12)
Check the level of the brackets using a spirit
level prior to tightening all the mounting screws.
It is important to get the horizontal level correct
so the water flow within the system operates
correctly. Refer to (Fig. 11 & Fig. 11.1)
Fig. 11
Fig. 11.1
Fig. 12
EN
08