Kohler K-1114P Manual de instalación - Página 9
Navegue en línea o descargue pdf Manual de instalación para Bañeras Kohler K-1114P. Kohler K-1114P 48 páginas. Bath with airjets and integral apron canada
También para Kohler K-1114P: Manual de instalación (48 páginas)
Secure the Unit (cont.)
Option Using Silicone Sealant
With help, carefully lift the bath into position.
Insert the drain tailpiece into the trap. Make sure the bath is level and resting on all support blocks.
Remove the protective tape from the rim. Apply a continuous bead of high-quality silicone sealant
around the entire rim of the bath.
Allow the sealant to cure according to the manufacturer's instructions.
5. Install the Plumbing
WARNING: Risk of property damage. Ensure a watertight seal on the bath drain.
Connect the drain to the trap according to the drain manufacturer's instructions.
NOTICE: An access panel will simplify future maintenance.
Install the faucet valving according to the faucet manufacturer's instructions. Do not install the
faucet trim until instructed. Open the hot and cold water supplies, and check the supply
connections for leakage.
Run water into the bath, and check the drain connections for leakage.
Kohler Co.
9
1034593-2-F