Kohler WELLWORTH WATERGUARD K-3521-CE Manual de instrucciones de instalación - Página 3

Navegue en línea o descargue pdf Manual de instrucciones de instalación para Aseos Kohler WELLWORTH WATERGUARD K-3521-CE. Kohler WELLWORTH WATERGUARD K-3521-CE 21 páginas. Vitreous china siphon jet toilet

Kohler WELLWORTH WATERGUARD K-3521-CE Manual de instrucciones de instalación

3. INSTALLATION

INSTALL NEW SHUT-OFF VALVE
For supply installation, refer to the instructions packed with the
supply stop.
Locate the supply shut-off valve so it is 10-1/4" (26cm) above the
floorline, and 5-3/4" (14.6cm) to the left of the centerline of the closet
flange.
Install new 5/16" diameter T-bolts.
INSTALL TOILET GASKET
Position the toilet upside down on padding.
Firmly attach the gasket around the toilet outlet. If you are using a
gasket with an integral plastic sleeve, position the gasket with the
sleeve facing away from the toilet.
If desired, place a 1/4" (6mm) thick bead of toilet setting compound
around the toilet base.
NOTE: If a rag or other plug was placed in the closet flange,
remove the rag before setting the toilet.
ALIGN AND SET TOILET
Carefully align and lower the toilet over the closet flange and T-bolts.
CAUTION: Risk of external leakage. Do not lift or rock
the toilet after placement. A new gasket must be reapplied
if you break the watertight seal.
Apply full body weight to the toilet rim to set the seal.
SECURE TOILET
Assemble the bolt cap bases, washers, and nuts on the exposed
T-bolts.
CAUTION: Risk of personal injury or product
damage. Overtightening may cause breakage or chipping.
Hand tighten the nuts, then tighten them an additional 1/2-turn with
a wrench. If the T-bolts extend more than 1/4" (6mm) from the top
of the nut, cut off the excess with a hacksaw, and file the cut edges.
Wipe away any residue. Install the bolt caps.
Kohler Co., Kohler, WI U.S.A.
10-1/4"
(26cm)
12"
(30.5cm)
T-Bolts
Bolt Cap
Nut
Washer
Bolt Cap Base
3
5-3/4"
(14.6cm)
Fig. #3
Closet Flange
Fig. #4
Gasket
Fig. #5
Fig. #6
Fig. #7
A
1007281-2-