ABACUS Aquanova Scorpio 1800 Paquete informativo - Página 4
Navegue en línea o descargue pdf Paquete informativo para Ayuda para el baño ABACUS Aquanova Scorpio 1800. ABACUS Aquanova Scorpio 1800 18 páginas. Fixed seat & transfer system operation
Pre - Installation Requirements
Access
When deciding on the positioning of the bath there are a number of points that should
be taken into consideration:
1. Hoist/wheelchair access
2. Service/cleaning access
3. Positions of any existing under oor pipe work or cabling
4. Con ict between doorways
5. Distance from walls/other objects
IMPORTANT - The bath must be sited at least 25mm away from any wall to ensure there
are no nger trap areas. It is usual to give around 100mm clearance to allow for easier
servicing if possible.
Flooring
Prepare the oor area and ensure it is at, level and structurally sound & there are NO
SERVICES BURIED within the oor xing area. For clarity there should be no services within
the space detailed on "Location of Bath End Feet Assembly" diagram.
Service Feeds - See Plumbing Diagrams A & B
Plumbing
This can be either wall or oor fed.
Feeds should be as follows: 22mm hot water inlet; 22mm cold water inlet; 40mm waste
outlet @ 3ltr/Sec. Plumb according to Plumbing Diagrams. Feeds should terminate with
isolating valves.
End Wall feeds.
Plumbing to terminate as per position A. Plumbing tails should be left at 325mm length.
Side Wall Plumbing Feed.
Plumbing to terminate as per position B. Plumbing tails should be left at 125mm length.
Floor Feeds
Plumbing to terminate as per position A or B. Tails c/w elbow should be left at 65mm
height o
oor.
.
.
.
.
4