CPI CXB2 Manual de instalación - Página 9

Navegue en línea o descargue pdf Manual de instalación para Validador de billetes CPI CXB2. CPI CXB2 13 páginas.

CPI CXB2 Manual de instalación
CHECK LIST
If a problem occurs:
Unit is dead (won't power up).
Steady ON Red (2 chevron bars) = (Comm
disabled from mech/VMC).
Note: Refer to the diagnostics chart on page 9
and to figure 7.
Steady ON Blue (1 chevron bar) = all
denominations disabled by the VMC.
©
CPI 2016
Please check the following:
1. Harness(es) maybe loose, not properly
connected, or have bent pins.
2. Check source voltage to ensure that
power is being supplied to the note
validator.
1. Must have product in the vending
machine. Check coin changer to ensure
the coin tubes have coins and the coin
changer is working properly. Check
vending machine controller (VMC) for
proper setup.
1. Check vending machine controller
(VMC) for proper setup.
P/N# 253052002
CXB2
Mexico
http://www.cranepi.com
9